* STAR CITY HOTEL -GUESTROOM BALCONIES & TERRACES |
Generally, balconies and features
are required for resort properties.
. Door / Frame: Design exterior doors and
frames to comply with air and water infiltration requirements
for project environment.
• Exterior metal, such as anodized aluminum or equal
exterior color finish or solid wood fabrication with metal
cladding and anodized finish in approved color.
• Stain or paint (factory finish) interior face of
wood doors to match door trim and millwork.
• In marine environments, provide aluminum exterior
with
finish such as Kynar (polyvinylidene fluoride, PVDF)
coating or equal to match color selected for interior jamb
and trim finish.
3. Door Hardware: Provide the following applicable to door
operation:
• Lock: Provide balcony, patio or terrace with a standard
door lock and a secondary lock such as a bar or latch (to
deter break-ins and operation by small children).
• Secondary Lock: Provide type that is easy to operate,
visually obvious and secure. Provide hinge door with
night-guard bar and sliding doors with a hinged “Charley
Bar” or “Engert” device (“U”
shaped hasp lock).
• Threshold: Aluminum
|
|
|
Balcony Guard Rail: Protect
the open sides of balconies to include a guard rail with
the following features:
• Rail Height: 1.1 m (3’-6”) minimum.
• Openings: Less than 10 cm (4 inch).
• Design Configuration: To restrict climbing.
• Floor Clearance: 5 cm (2 inch) maximum to minimize
falling objects.
• Graphics: Include signage regarding balcony safety
|
|
Furnishings:
Provide two chairs and one table minimum, of good quality
aluminum constructiondesigned for outdoor use.
• Select fixtures that conceal the light source.
• Avoid exterior light fixtures where insects are
attracted
and fixture lights create erratic, conflicting and poor
exterior lighting.
• At beach resorts, comply with environmental laws.
7. Finishes at Balconies: Provide finish walls as required
for exterior building finishes.
• Provide membrane waterproofing below selected
finish material (such stone or tile pavers) on structural
slabs above occupied areas.
• Finish deck surface may be concrete (with added
color), large unglazed ceramic tile pavers or stone
with minimum 0.6 wet / dry slip resistance.
• Seal grouted joints with penetrating sealer.
• Slope decks away from building to drain surface
water
to storm water collection system
|
|
|
|