Lessons to be learned
Procedures to ensure early call out to the Fire Brigade
Provisions for speedy access to the fire floor via protected
fire fighting lifts and use of wet risers
Effective compartmentation measures, including sprinkler
protection for high-rise buildings
Good coordination of fire safety measures with refurbishment
works and programme, especially in an occupied building
Structural fire full frame analysis, rather than single
element small-scale fire tests, as a basis for design
|